Product Detail :
|
Hiring of hemm for excavating overburden (including drilling in all kinds of strata /overburden/in situ), loading in to tippers, transportation and unloading of excavated materials & silt, dumping, dozing, scrapping / removal of all bands, preparation/ maintenance of haul road, water sprinkling and spreading of material at the site shown and as per directives of the management /engineer-in-charge at baroud oc expansion, raigarh area for a total quantity of 56.26 l.cum (9.29 l.cu.m of soft soil & 46.96 l.cu.m of hard strata) and for a period of 503 days with minimum quantity 11,183 cu.m per day tehsil-gharghoda.
|