Product Detail :
|
Design, engineering including investigations, construction of marine civil structures, mechanization from cj 1 with installation of two nos. gantry grab type unloaders of 2000 tph each and conveyor system of 4000 tph with interconnection to existing conveyor system including all fabrication, assembly, inspection & testing at manufacturer / sub vendor’s works, supply, storage, erection, testing, commissioning and 24 months of operation and maintenance including all civil, mechanical, electrical, control & instrumentation works for tangedco in voc port trust.
|