Product Detail :
|
Repairing of Shivbari spur including stabilization of D/S bank and strengthening of tie bund of river Brahmaputra (Ph- |) Assam integrated flood and river bank erosion risk management project for Chenimari, Bahari, Bhogérpar and its adjoining areas
(inel protection of Bahari Satra and Dokreswar Devalaya).Ph.-I., Protection of flood embankment along Kollong river from Azarbari to Rly Bridge (L/B) in between Ch. 8.5 Km to Ch. 10 Km. R/S to M.E. along L/B of River Noona from ‘0’ point at Khaponikuchi to its outfall at Kuntibari. (Phase-|) Protection of Jangmi Bey gaon from the erosion of river Harina.
|